

National quality inspection center zhengzhou comprehensive test base construction project external wall decoration project
Its headquarters is located in Business Zone of Xinjiekou, Nanjing, known as China No.1 Business District; the curtain wall production base is located in Huangtang Industrial Park, Danyang City, Jiangsu Province, with an area of 65,000 square meters and a construction area of 39,800 square meters
Keyword:
National quality inspection center zhengzhou comprehensive test base construction project external wall decoration project
Classification:
product details
The project is an architectural complex, including the e-1, e-2 laboratory, the complex building, the attached building, and the e-4 integrated service building. The e-1 and e-2 experimental buildings are high-rise residential buildings. The e-1 building is the henan provincial metrology research institute. The e-2 building is the quality control institute of henan province and the construction area is about 35500 m2. The complex building and the attached building are the high-rise civil buildings. The main design content is the hall of affairs and the multi-function hall of the administrative examination and approval service center. The construction area is about 30511 square meters. The e-4 integrated service building is a multi-storey civil building, with the main design content of the staff dining room, large meeting room and roof tennis court. The building area is about 2602 square meters.
Building floors: e-1, e-2 laboratory floor 9 floors, 1 floor underground, 1 layer high 6.00 meters high, 2 ~ 9 layers high 4.20 meters high, the total height of the building is 43.00 meters; The floor of the complex is 15 storeys high 6.00 meters high and 4.50 meters high, with a height of 3.90 meters and a total height of 67.30 meters. The e-4 comprehensive service floor has 2 floors, one layer and the second layer is 6.00 meters high. The total height of the building is 18.00 meters.
Structure type: e-1, e-2 experimental building adopts frame-shear wall structure; The complex building adopts frame - shear wall structure, attached to the frame structure form; The e-4 comprehensive service building adopts frame structure;
Building fire resistance grade: level 1, design and execution gb50016-2006 architectural design fire prevention code;
The class of seismic fortification of buildings: the importance of function and the classification of antiseismic fortification are the key fortification buildings;
Seismic fortification intensity: 7 degrees (0.15 g);
The design period of the building is 50 years.
The curtain wall has been designed for 25 years, and the security level of the curtain wall is secondary.
Product message